Wide view of Geocadia's Jordbro drilling site, with the branded rig, drill pipes and support equipment
Our GM2000 at Jordbro Actual Geocadia field photograph

Deep geothermal heating

One complete deep-geothermal energy system.

We design the system around your building’s heat demand, drill with our own GM2000 rig, then install and commission the heating centre and building connection. Own the complete system, or buy metered heat through Energy as a Service.

Only your first name and email are required.

Entire System Geocadia drill-site setup

One accountable delivery

We design, drill and deliver your heating system.

Our own drilling rig. Your custom heating centre. Planned together and connected to your building.

01Understand the property
02Design the complete system
03Build the source and heating centre
04Commission and hand over
Concept cutaway of a deep closed-loop borehole descending through bedrock from a surface drilling site Concept visual · Not a project photograph
From rock to useful heat Heat travels through a closed-loop borehole to the plant room, where heat pumps raise it to the temperature required by the building. Blue shows cold water going down the borehole; orange shows warm water coming back up. Heat-pump plant Useful heat 1Cold water flows down 2Bedrock warms itAbout 2,000 m down at Jordbro 3Warm water comes back up 4Heat pumps lift the temperatureUseful heat for your building Blue: cold water going downOrange: warm water coming up
  1. Cold water flows down the closed loop.
  2. Bedrock warms it. At Jordbro, the borehole reaches about 2,000 m.
  3. Warm water comes back up to the surface.
  4. Heat pumps lift the temperature to useful heat for your building.

Complete system · source to building

We engineer and design the heating centre around your building.

Heat-pump compressors, storage, filtration, controls and metering. Designed for your property and verified before handover.

  • Heat pumps sized to property load and building temperatures
  • Storage, filtration and controls for stable operation
  • Closed-loop borehole as the long-lived energy source

For property operationsA commissioning baseline for operation and maintenance.

Visual is conceptual. Final heating-centre and borehole systems are property-specific.

01 · Custom-designed heating centre

Turn source energy into useful heat

Heat pumps, storage and filtration sized for your building.

02 · Commissioning

Verified and handed over

Controls, metering and building connection verified before handover.

03 · Property operations

A baseline to measure against

Commissioning values recorded for performance review and maintenance.

04 · Long-lived source

Depth set by geology and demand

About 2,000 m at the Jordbro borehole we drilled. Closed-loop collector; no groundwater extracted.

Start with the property

Three steps to a clear first decision.

An address and rough heat demand are enough to begin. We tell you what we can check now and what the next decision needs.

01 · Screen

Screen the property

Share the address, current heat source and rough demand. We check the technical fit and ask for anything missing.

02 · Define

Define the system

Demand, geology, access and the building connection shape the borehole, heat-pump plant and delivery plan.

03 · Choose

Choose the commercial route

Invest in and own the complete system, or pay per kWh of heat while Geocadia finances, owns and operates it.

Who we heat

Where deep geothermal fits.

We design, drill and deliver the complete heating system for your building.

  • Drilled with our own GM2000 rig.
  • Borehole, heat-pump plant and building connection from one team.
  • Building new? We can drill early and heat the construction site.
Screen a property →

Commercial paths

Own the system, or buy the heat.

Both routes use the same system, designed for your property. What changes is who owns it and how you pay. In both, the property pays for the electricity that runs the heat pumps.

Our project · Catena, Jordbro

At Jordbro, we drilled about 2,000 metres into the bedrock.

Our own GM2000 rig drilled the borehole at Catena’s Jordbro property. The system is installed and operating, designed to supply about 1,500 MWh of heat a year. Every new system is sized to the property’s demand, geology, access and integration.

Actual Geocadia field footage Drill pipes stored beside field equipment. Context footage only; this clip is not attributed to the Jordbro property. Used with permission. Site and videographer remain to be confirmed.
Elevated view of the Geocadia drilling rig, stored drill pipes and support equipment at Jordbro, Sweden

Actual Geocadia field photograph Drilling and field delivery at Jordbro, Sweden.

Drilled by Geocadia

About 2,000 metres deep. Designed for about 1,500 MWh a year.

≈2,000 mBorehole depth
≈1,500 MWhDesigned annual heat output
4 × 60 kWHeat-pump design
25 to 40 m²Plant-room footprint

Project: Catena, Jordbro. Geocadia drilled the borehole with its own GM2000 rig. System installed and operating.

Example Geocadia drilling-site layout measuring 40 by 30 metres with GM2000, compressor modules, RobotArm and cuttings handling

Geocadia technical planning graphic · Example configuration

We design the drilling plan around your property.

Before equipment arrives, we plan the rig, compressors, rod handling, cuttings flow, access and field office around your site. You get a worksite plan before drilling starts. The final arrangement is designed for your property.

40 × 30 mExample drilling-site layout
RobotArmAutomated drill-rod handling

Field delivery · Actual Geocadia photography

Our own rig and crews at work.

Geocadia equipment and people across different field conditions.

Geocadia drilling crew working beside the GM2000 rig at a winter site
Actual photo · Geocadia winter drilling crew
Elevated view of the Geocadia GM2000 drilling rig beside separate support units
Actual photo · Geocadia GM2000 and support equipment
Three-quarter view of a Geocadia-branded field support unit
Actual photo · Geocadia field support equipment

Our drilling technology. Your complete heating system. Geocadia GM2000

Actual field sequence

See how the worksite comes together.

Two short views of field preparation and casing drilling. Playback is always controlled by you.

Actual video · Site preparation Used with permission. Site attribution and videographer remain to be confirmed.
Actual video · Casing drilling Used with permission. Site attribution and videographer remain to be confirmed.

About Geocadia

People who build the whole system.

Our board, leadership, delivery crews and technology teams work together across Sweden and Finland.

56 FTEAcross Sweden and Finland
One groupFrom property screening to technology and operation
Meet the board, executives and teams →
Geocadia field crew gathered for a team briefing beside site equipment
Actual Geocadia photograph · Field team briefing

Your property

Tell us about your property.

An address and rough heat demand are enough to begin. Only your first name and email are required.

Screen a property Start a conversation